WESFIN LAB / GUIDES

Guides How to connect, validate and present energy equipment in Wesfin Lab

Start with the simulator tutorial. Recipes help with one task, the reference lets you check fields, explanations tell you why.

Tutorials

Go from nothing to a result in one sitting.

How-to guides

Short recipes for one specific task.

Reference

Fields, topics, statuses and terms to check against.

Explanations

Why the Lab works the way it does.

In a minute

How a bounded command travelsSIMULATED
  1. CommandThe Lab sends a power, a duration and a TTL within the profile's limits.
  2. AcknowledgedThe connector accepted the command.
  3. ExecutedThe device applied the new power.
  4. MeasuredAn independent measurement sees the change.
  5. RestoredAfter the duration the device returns to its baseline.

Each stage is separate evidence with its own source. An acknowledgement does not yet mean the power changed.

How a profile is validated
  1. SchemaEvery field is present, with the right types and limits.
  2. MeaningLimits agree with each other and the required telemetry is there.
  3. SafetyTTL is required, failure closes control, restore goes to baseline.
  4. TestsThe standard scenario pack on the deterministic simulator.
  5. ReportVerdict, blockers and hashes so the report can be checked.

If any stage fails, the report names the reason and the version stays unvalidated.

Every example runs in LAB. A Lab connection grants no production control and no energy market participation.